πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content Skip to project content
Solar farms Β· Perth & Kinross

Halfway Energy Park, Carse of Gowrie

In planning

Aukera proposes up to 500 MW of solar generation and up to 100 MW of co-located battery storage between Inchture, Errol and Rait. The project is at consultation and pre-application stage, not an operating farm. It supplements the July register with a later proposal.

Sources reviewed 2026-10-08 Β· Aukera / Halfway Energy Park Ltd

Project facts

StatusIn planning
Developer / operatorAukera / Halfway Energy Park Ltd
RegionPerth & Kinross
CountryScotland
Published rating500 MW
Rating definitionProposed solar generation, up to
Connection / routeProposed network connection; energisation not verified
Delivery targetNot verified in this profile

Generation and storage

Aukera proposes up to 500 MW of solar generation and up to 100 MW of co-located battery storage between Inchture, Errol and Rait. The project is at consultation and pre-application stage, not an operating farm. It supplements the July register with a later proposal.

Associated battery: 100 MW; stored energy Not published. Generation and battery power are separate ratings.

Published power is a proposal or nameplate rating, not measured output. Construction, grid connection and operation require separate evidence.

Project location

The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.

Loading OpenStreetMap…

Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2’s additional outlines and route layers are explicitly identified in the developer’s map data.

Sources and review date

  1. Developer project and consultation
    Reviewed 2026-10-08
  2. Solar, battery and location definitions
    Reviewed 2026-10-08
  3. Aukera project overview
    Reviewed 2026-10-08

How Octary distinguishes proposals, published ratings and live measurements

Report a correction with a source

GRID CONTEXT

Great Britain electricity now

Explore the grid β†’
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.