Project facts
| Status | In planning |
|---|---|
| Developer / operator | Aukera / Halfway Energy Park Ltd |
| Region | Perth & Kinross |
| Country | Scotland |
| Published rating | 500 MW |
| Rating definition | Proposed solar generation, up to |
| Connection / route | Proposed network connection; energisation not verified |
| Delivery target | Not verified in this profile |
Generation and storage
Aukera proposes up to 500 MW of solar generation and up to 100 MW of co-located battery storage between Inchture, Errol and Rait. The project is at consultation and pre-application stage, not an operating farm. It supplements the July register with a later proposal.
Associated battery: 100 MW; stored energy Not published. Generation and battery power are separate ratings.
Published power is a proposal or nameplate rating, not measured output. Construction, grid connection and operation require separate evidence.
Project location
The map distinguishes published or mapped site points from approximate location and connection areas. Dashed circles are context areas, not development boundaries. Follow the location sources for site plans.
Loading OpenStreetMapβ¦
- Inchture area Approximate area; exact site not confirmed Open larger map Location source Coordinate source 56.446, -3.168 Β· WGS84
- Errol area Approximate area; exact site not confirmed Open larger map Location source Coordinate source 56.392, -3.213 Β· WGS84
Markers identify sites, published points or labelled connection areas. Markers are not site boundaries or entrances. EGL2βs additional outlines and route layers are explicitly identified in the developerβs map data.
Sources and review date
- Developer project and consultation
Reviewed 2026-10-08 - Solar, battery and location definitions
Reviewed 2026-10-08 - Aukera project overview
Reviewed 2026-10-08
How Octary distinguishes proposals, published ratings and live measurements