Binn Farm Solar Farm

Binn Farm, Glenfarg, Perth, Tayside, PH2

Binn Farm Solar Farm is a 39 MW solar farm project in Scotland. The applicant or operator on record is Trio Power Limited. The scheme is currently in the planning system, submitted January 2026. The determining authority is Perth and Kinross, reference 25/01836/FLM.…

In Planning
Project stageIn planning
  1. PlanningJan 2026 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2026-02-05.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

39.000 MW
Registered Capacity

πŸ“‹ Project Overview

Binn Farm Solar Farm is a 39 MW solar farm project in Scotland. The applicant or operator on record is Trio Power Limited. The scheme is currently in the planning system, submitted January 2026. The determining authority is Perth and Kinross, reference 25/01836/FLM.

Site Schematic

SUBSTATION ? ha Β· 39 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)39.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTrio Power Limited
Owner / operatorTrio Power Limited
LocationBinn Farm, Glenfarg, Perth, Tayside, PH2
RegionScotland
Coordinates56.3870031Β°N, 3.4040006Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Storage Co-location REPD Ref ID19596
Mounting Type for SolarGround
Solar Site Area (sqm)588500

πŸ“… Project Timeline

2026-01-20