πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

Bonnyknox Solar Farm

Fallaws Of Arbirlot Arbirlot, Angus, DD11 2PR

Bonnyknox Solar Farm is a 49.9 MW solar farm project in Scotland. The applicant or operator on record is Renewable Energy Systems (RES). The scheme is currently in the planning system, submitted July 2025. The determining authority is Angus, reference 25/00339/FULM.…

In Planning
Project stageIn planning
  1. PlanningJul 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated 2025-08-14.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.900 MW
Registered Capacity

πŸ“‹ Project Overview

Bonnyknox Solar Farm is a 49.9 MW solar farm project in Scotland. The applicant or operator on record is Renewable Energy Systems (RES). The scheme is currently in the planning system, submitted July 2025. The determining authority is Angus, reference 25/00339/FULM.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Energy Systems (RES)
Owner / operatorRenewable Energy Systems (RES)
LocationFallaws Of Arbirlot Arbirlot, Angus, DD11 2PR
RegionScotland
Coordinates56.5558128Β°N, 2.7005695Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)954500

πŸ“… Project Timeline

2025-07-01