Hillhouse Quarry, B730 From A759 Jnct Dundonald To Council Boundary, S/O Railway Bridge, Dundonald, Kilmarnock, Strathclyde, Ayrshire, KA2 9BE
Hillhouse Quarry, Railway Bridge - Solar Array is a 3 MW solar farm project in Scotland. The applicant or operator on record is Hillhouse Quarry Company Limited. The scheme is currently in the planning system, submitted June 2024. The determining authority is South Ayrshire, refeβ¦
In Planning
Project stageIn planning
PlanningJun 2024 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2024-06-28.
Registered planning capacity; not measured generation.
Hillhouse Quarry, Railway Bridge - Solar Array is a 3 MW solar farm project in Scotland. The applicant or operator on record is Hillhouse Quarry Company Limited. The scheme is currently in the planning system, submitted June 2024. The determining authority is South Ayrshire, reference 24/00424/APP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Hillhouse Quarry Company Limited
Owner / operator
Hillhouse Quarry Company Limited
Location
Hillhouse Quarry, B730 From A759 Jnct Dundonald To Council Boundary, S/O Railway Bridge, Dundonald, Kilmarnock, Strathclyde, Ayrshire, KA2 9BE