GENERATION · NETWORKS · ELECTRICITY DEMAND

All energy projects

Explore operating assets, construction and proposals across the electricity system. Find the capacity, planning status and evidence behind each project.

477Matching project records
0Operating records
477Construction or enabling works
July 2026Official renewable register edition
DESNZ tracks projects over 150 kW, with limitations for smaller historical projects. Rows represent planning records and may include linked applications, extensions and separate storage phases. Do not sum them as a definitive national fleet total.
Reset filters

Project map

Use the map to explore the matching projects. Solid markers show published or mapped points; shaded dashed circles show approximate areas. Cable endpoints are shown separately.

Loading OpenStreetMap…

477 results

Understand capacity and annual energy →
Thermal & carbon capture

Net Zero Teesside Power

Under construction
742 MW

Published generating capacity

Teesside · England

bp / Equinor

Construction is underway on this gas-fired combined-cycle plant with integrated carbon capture. The developer targets start-up in 2028 and up to 742 MW output. Captured CO₂ would use Northern Endurance Partnership transport and storage. It is a fossil-fuel project with carbon capture, not renewable generation.

Grid upgrades

Netherton / Longside 400 kV and 132 kV AC Substations

Under construction
Not published

Component of a parent transmission project; no additional link capacity counted

Netherton / Longside / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

The two AC substations at Netherton Hub support generation and storage connections and onward transmission. They form a different infrastructure package from the site’s HVDC converters. Shared site civil works are underway; detailed electrical approvals and energisation follow separately.

Grid upgrades

Netherton Hub / Longside substations and HVDC converters

Under construction
Not published

Multiple substations and converters

Longside / Flushing / Peterhead, Aberdeenshire · Scotland

SSEN Transmission

Main hub construction is underway near Longside, west of Peterhead. The development comprises 400 kV and 132 kV substations, separate Spittal–Peterhead and EGL3 HVDC converter stations, a transmission hall identified for EGL5, and an operations and spares base. Shared site earthworks do not mean that every converter or cable is already operational.

Interconnectors

NeuConnect (Great Britain–Germany)

Under construction
1,400 MW

Transfer capacity

Kent / Germany · United Kingdom

NeuConnect

Converter fit-out was reported in September 2026. NeuConnect is the first direct electricity connection between Great Britain and Germany, with approximately 725 km of land and subsea cables. It supports imports or exports according to system conditions.

Transmission links

Orkney–Caithness Transmission Link

Under construction
220 MW

Transfer capacity

Orkney / Caithness · Scotland

SSEN Transmission

Underground cable installation began in September 2026. The scheme includes Finstown substation, a 14 km land cable to Warebeth and a 53 km subsea cable to Dounreay. It creates Orkney’s first connection to the mainland transmission network.

GRID CONTEXT

Great Britain electricity now

Explore the grid →
Loading the latest published grid interval…

National figures from the Carbon Intensity API. These do not measure an individual project’s output, cable flow or data-centre electricity use.

The wider power system

Explore conventional and nuclear power stations, grid connections, renewable technology guides and source updates.

Read the scope, licences and refresh schedule