🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Battery storage › Texas

OCTARY USA · BATTERY STORAGE

Operating battery storage sites in Texas — page 3

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating263plants
Operating capacity19.3 GWnameplate
Under construction8,350 MW60 plants
Whole pipeline25.3 GWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

263 plants · page 3 of 6
PlantCapacityStageStateOwner / operatorYear
Dogfish BESS 75.0 MW
75 MWh
Operating TX
Pecos
Dogfish ESS Assets, LLC 2025
House Mountain 73.2 MW
120 MWh
Operating TX
Brewster
House Mountain 2024
Ranchland Wind Storage 73.0 MW
109 MWh
Operating TX
Callahan
Ranchland Wind Storage, LLC 2023
Stampede Solar Hybrid 72.2 MW
115 MWh
Operating TX
Hopkins
Stampede Solar Project LLC 2024
Fence Post Solar Hybrid Project, LLC 72.0 MW
115 MWh
Operating TX
Navarro
Fence Post Solar Project, LLC 2024
Ganado Solar 70.5 MW
115 MWh
Operating TX
Jackson
Enel Green Power NA, Inc. 2024
Antlia 70.0 MW
140 MWh
Operating TX
Val Verde
Engie North America 2025
Liberty Hybrid Solar and Storage Project 65.0 MW
62 MWh
Operating TX
Harris
Liberty 1 Solar LLC 2026
High Lonesome Wind Power, LLC Hybrid 63.3 MW
81 MWh
Operating TX
Upton
High Lonesome Wind Power, LLC 2023
Roadrunner, LLC Hybrid 63.3 MW
109 MWh
Operating TX
Upton
Roadrunner Solar, LLC 2023
Lower Rio Energy Storage 60.0 MW
120 MWh
Operating TX
Hidalgo
VESI 38 LLC 2025
Cross Trails Energy Storage Project 58.3 MW
114 MWh
Operating TX
Scurry
Energy Vault, Inc. 2025
Lily Solar Hybrid 55.2 MW
81 MWh
Operating TX
Kaufman
Lily Solar, LLC 2021
Roseland Solar Project, LLC 51.8 MW
85 MWh
Operating TX
Falls
Enel Green Power Roseland Solar, LLC 2023
Blue Jay Solar I, LLC 51.6 MW
85 MWh
Operating TX
Grimes
Blue Jay Solar I, LLC 2023
Byrd Ranch Storage 50.0 MW
50 MWh
Operating TX
Brazoria
Byrd Ranch Storage LLC 2022
Midpoint Solar, LLC 50.0 MW
100 MWh
Operating TX
Hill
Sunraycer Assets I LLC 2026
Padua 1 50.0 MW
200 MWh
Operating TX
Bexar
Padua 1 2025
Tortolas 50.0 MW
50 MWh
Operating TX
Brazoria
Engie North America 2024
TX11 Republic Road Storage 50.0 MW
50 MWh
Operating TX
Robertson
Key Capture Energy 2022
TX13 Endurance Park Storage 50.0 MW
50 MWh
Operating TX
Scurry
Key Capture Energy 2022
TX19 River Valley Storage 1 50.0 MW
111 MWh
Operating TX
Williamson
Key Capture Energy 2023
TX21 River Valley Storage 2 50.0 MW
107 MWh
Operating TX
Williamson
Key Capture Energy 2023
TX23 Roughneck Storage 50.0 MW
50 MWh
Operating TX
Brazoria
Key Capture Energy 2022
Zier Solar 40.4 MW
80 MWh
Operating TX
Kinney
Cypress Creek Renewables 2024
2W Permian Solar Project Hybrid 40.0 MW
40 MWh
Operating TX
Andrews
2W Permian Solar, LLC 2021
Notrees Windpower Hybrid 36.0 MW
14 MWh
Operating TX
Ector
Deriva Energy 2012
Blue Summit Storage, LLC 30.0 MW
13 MWh
Operating TX
Wilbarger
Blue Summit Storage, LLC 2017
Upton County BESS 24.8 MW
25 MWh
Operating TX
Upton
VESI Upton County BESS, LLC 2023
Pueblo BA 19.8 MW
20 MWh
Operating TX
Maverick
Engie North America 2022
Zapata 19.8 MW
20 MWh
Operating TX
Zapata
Engie North America 2022
Cameron Wind 1 LLC 16.4 MW
33 MWh
Operating TX
Cameron
Cameron Wind 1 LLC 2024
Inertia Energy Storage 13.0 MW
45 MWh
Operating TX
Haskell
Inertia Energy Storage LLC 2025
Crosby Clean Energy Center (BESS) 12.0 MW
21 MWh
Operating TX
Harris
On Energy Storage 2025
Maverick Clean Energy Center (BESS) 12.0 MW
21 MWh
Operating TX
Brazoria
On Energy Storage 2025
Spencer Clean Energy Center (BESS) 12.0 MW
21 MWh
Operating TX
Harris
On Energy Storage 2025
Winmil Clean Energy Center (BESS) 12.0 MW
21 MWh
Operating TX
Brazoria
On Energy Storage 2025
Toyah Power Station 10.4 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2021
Alamo Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Pecos
On Energy Storage 2026
Fort Stockton Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Pecos
On Energy Storage 2026
Mesquite Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Cameron
On Energy Storage 2026
North Pecos Clean Energy Center (BESS) 10.1 MW
20 MWh
Operating TX
Reeves
On Energy Storage 2026
Aggreko MSR Grid PC2 10.0 MW
19 MWh
Operating TX
Nueces
DGI Rattler LLC 2026
Aggreko MSR Grid PC5 10.0 MW
19 MWh
Operating TX
Cameron
DGI Rattler LLC 2026
Aggreko MSR Grid PC7 10.0 MW
19 MWh
Operating TX
Cameron
DGI Rattler LLC 2026
BESS La Feria 10.0 MW
25 MWh
Operating TX
Cameron
Grenergy USA LLC 2026
BESS Stadium 10.0 MW
25 MWh
Operating TX
Jim Wells
Grenergy USA LLC 2026
BESS TX Panda - BSHOU004 10.0 MW
10 MWh
Operating TX
Harris
Prologis Logistics Services Incorporated BESS 2025
BESS TX Top Gear - BSHOU002 10.0 MW
25 MWh
Operating TX
Harris
Prologis Logistics Services Incorporated BESS 2025
Century BESS 10.0 MW
25 MWh
Operating TX
Tarrant
Prologis Logistics Services Incorporated BESS 2024
Page 3 of 6

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map