United States βΊ Power plants βΊ Solar farms
OCTARY USA Β· SOLAR FARMSVesper Energy Development LLC: planned solar farms in the USA
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating1plants
Operating capacity600 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline3,619 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
15 plants
| Plant | Capacity | Stage |
|---|---|---|
| Sunscape Renewable Energy | 500 MW | In planning |
| Firefly Solar PA | 402 MW | In planning |
| Red Hollow Renewable Energy | 300 MW | In planning |
| Sunrose Renewable Energy | 300 MW | In planning |
| Athens Solar I (Hybrid) | 250 MW | In planning |
| Mystic Springs Renewable Energy (Hybrid) | 250 MW | In planning |
| Axton Solar | 201 MW | In planning |
| Hornet Solar II (TX) (Hybrid) | 200 MW | In planning |
| Scopus Solar | 200 MW | In planning |
| Vichy Solar | 200 MW | In planning |
| Kingwood Solar | 175 MW | In planning |
| Meadow Springs Renewable Energy (Hybrid) | 150 MW | In planning |
| Bradford Solar PA | 101 MW | In planning |
| Skylight Renewable Energy | 100 MW | In planning |
| Aurora Renewable Energy (Hybrid) | 50.0 MW | In planning |
Operating capacity by state
Click a state to drill down.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Vesper Energy Development LLC15 plants Β· 3,378 MW
- BrightNight Power5 plants Β· 3,257 MW
- Cypress Creek Renewables18 plants Β· 2,424 MW
- Clenera DevCo LLC6 plants Β· 1,775 MW
- EDF Renewables Development, Inc.7 plants Β· 1,629 MW
- Intersect USA, LLC3 plants Β· 1,305 MW
- Repsol Renewables NA5 plants Β· 1,225 MW
- TerraForm Power Operating, LLC2 plants Β· 1,214 MW
- Sunstone Solar, LLC1 plants Β· 1,200 MW
- Vista Sands Solar LLC1 plants Β· 1,182 MW
- Leeward Asset Management, LLC7 plants Β· 1,098 MW
- Dominion Renewable Energy5 plants Β· 1,025 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map