United States › Power plants › Solar farms › Pennsylvania
SOLAR FARMSBradford Solar PA
Bradford Solar PA is a 101 MW planned solar farm in Bradford County, Pennsylvania, operated by Vesper Energy Development LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BRDFS | Solar Photovoltaic | 101 MW | Regulatory approvals pending |
Plant details
- Operator
- Vesper Energy Development LLC
- Location
- Bradford County, Pennsylvania
- Balancing authority
- PJM
- Sector
- IPP Non-CHP
- Capacity
- Planned: 101 MW
- EIA plant ID
- 68014
Location
41.7217, -76.5366
Nearby power plants
- Norther Tier LandfillBioenergy plants · 1.6 MW · 6.1 mi
- Hamilton LibertyGas power plants · 870 MW · 8.2 mi
- MilanGas power plants · 21.0 MW · 12.2 mi
- Towanda FacilityGas power plants · 4.8 MW · 14.4 mi
- Wolf Run EnergyGas power plants · 22.0 MW · 14.4 mi
- AlpacaGas power plants · 21.0 MW · 14.5 mi
- Armenia Mountain Wind FarmWind farms · 101 MW · 16.7 mi
- Beaver Dam (PA)Gas power plants · 22.0 MW · 17.6 mi
- Vulcraft SolarSolar farms · 1.6 MW · 20.1 mi
- Hunt CreekSolar farms · 4.0 MW · 25.5 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem