United States βΊ Power plants βΊ Washington
OCTARY USA Β· POWER PLANTSCancelled power plants in Washington
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Sinclair BESS Battery storage |
200 MW | Withdrawn / abandoned |
| Coyote Crest Wind Farm Wind farms |
128 MW | Withdrawn / abandoned |
| Black Rock Solar LLC Solar farms |
100 MW | Withdrawn / abandoned |
| Tono Solar Solar farms |
80.0 MW | Withdrawn / abandoned |
| Lund Hill Wind farms |
60.0 MW | Withdrawn / abandoned |
| SPI - Everett Bioenergy plants |
28.0 MW | Withdrawn / abandoned |
| Sullivan CR Hydroelectric plants |
9.0 MW | Withdrawn / abandoned |
| Fumaria Solar Project Solar farms |
5.0 MW | Withdrawn / abandoned |
| Typha Solar Project Solar farms |
5.0 MW | Withdrawn / abandoned |
| Roosevelt Biogas 1 Bioenergy plants |
2.1 MW | Withdrawn / abandoned |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Hydroelectric plants21.3 GW
- Gas power plants4,045 MW
- Wind farms3,387 MW Β· +326 MW pipeline
- Solar farms348 MW Β· +1,570 MW pipeline
- Battery storage4.0 MW Β· +1,655 MW pipeline
- Nuclear power plants1,200 MW
- Coal power plants730 MW
- Bioenergy plants284 MW
- Other power plants0.0 MW Β· +50.0 MW pipeline
- Oil-fired power plants17.5 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- SINC bn, LLC1 plants Β· 200 MW
- Big Sky Wind, LLC1 plants Β· 128 MW
- Black Rock Solar LLC1 plants Β· 100 MW
- TransAlta Holdings U.S. Inc.1 plants Β· 80.0 MW
- Avangrid Power LLC1 plants Β· 60.0 MW
- Sierra Pacific Industries1 plants Β· 28.0 MW
- TUUSSO Energy, LLC2 plants Β· 10.0 MW
- PUD No 1 of Pend Oreille County - (WA)1 plants Β· 9.0 MW
- PUD No 1 of Klickitat County1 plants Β· 2.1 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map