United States › Power plants › Solar farms › Washington
SOLAR FARMSTono Solar
Tono Solar is a 80.0 MW cancelled solar farm in Lewis County, Washington, operated by TransAlta Holdings U.S. Inc..
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| TSPV1 | Solar Photovoltaic | 80 MW | Cancelled or postponed |
Plant details
- Operator
- TransAlta Holdings U.S. Inc.
- Location
- Lewis County, Washington
- Balancing authority
- BPAT
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 80.0 MW
- EIA plant ID
- 63902
Location
46.7800, -122.8600
Nearby power plants
- Centralia Battery Energy Storage SystemBattery storage · 200 MW · 1.2 mi
- Transalta Centralia GenerationCoal power plants · 730 MW · 1.7 mi
- SkookumchuckHydroelectric plants · 1.0 MW · 6.6 mi
- Skookumchuck Wind FacilityWind farms · 136 MW · 10.5 mi
- Chehalis Generating FacilityGas power plants · 593 MW · 11.2 mi
- YelmHydroelectric plants · 12.0 MW · 17.1 mi
- MayfieldHydroelectric plants · 162 MW · 23.0 mi
- LaGrandeHydroelectric plants · 64.0 MW · 25.8 mi
- AlderHydroelectric plants · 51.0 MW · 26.1 mi
- MossyrockHydroelectric plants · 300 MW · 26.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem