BATTERY STORAGECentralia Battery Energy Storage System
Centralia Battery Energy Storage System is a 200 MW planned battery storage site in Thurston County, Washington, operated by CENT bn, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| CENT | Batteries | 200 MW | Regulatory approvals pending |
Plant details
- Operator
- CENT bn, LLC
- Location
- Thurston County, Washington
- Balancing authority
- PSEI
- Sector
- IPP Non-CHP
- Capacity
- Planned: 200 MW
- EIA plant ID
- 68282
Location
46.7798, -122.8848
Nearby power plants
- Transalta Centralia GenerationCoal power plants · 730 MW · 2.0 mi
- SkookumchuckHydroelectric plants · 1.0 MW · 7.8 mi
- Chehalis Generating FacilityGas power plants · 593 MW · 11.0 mi
- Skookumchuck Wind FacilityWind farms · 136 MW · 11.5 mi
- YelmHydroelectric plants · 12.0 MW · 17.9 mi
- MayfieldHydroelectric plants · 162 MW · 23.7 mi
- LaGrandeHydroelectric plants · 64.0 MW · 27.0 mi
- AlderHydroelectric plants · 51.0 MW · 27.2 mi
- MossyrockHydroelectric plants · 300 MW · 27.6 mi
- Grays Harbor Energy FacilityGas power plants · 715 MW · 31.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem