🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Washington

SOLAR FARMS

Fumaria Solar Project

Fumaria Solar Project is a 5.0 MW cancelled solar farm in Kittitas County, Washington, operated by TUUSSO Energy, LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Washington

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
FUMARSolar Photovoltaic5.0 MW Cancelled or postponed

Plant details

Operator
TUUSSO Energy, LLC
Location
Kittitas County, Washington
Balancing authority
PSEI
Sector
IPP Non-CHP
Capacity
Cancelled: 5.0 MW
EIA plant ID
62070

Location

47.0610, -120.5840

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem