🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Hydroelectric plants › Washington

HYDROELECTRIC PLANTS

Sullivan CR

Sullivan CR is a 9.0 MW cancelled hydroelectric plant in Pend Oreille County, Washington, operated by PUD No 1 of Pend Oreille County - (WA).

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore hydroelectric plants in Washington

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
1Conventional Hydroelectric4.5 MW Cancelled or postponed
2Conventional Hydroelectric4.5 MW Cancelled or postponed

Plant details

Operator
PUD No 1 of Pend Oreille County - (WA)
Location
Pend Oreille County, Washington
Sector
Electric Utility
Capacity
Cancelled: 9.0 MW
EIA plant ID
773

Location

48.8633, -117.3453

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem