SOLAR + STORAGE Β· PJMSolar + storage project AG1-484, Cumberland County
Solar + storage project AG1-484, Cumberland County is a 20.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Cumberland County, Pennsylvania, connecting to ME.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-484
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Mountain 115 kV
- Location
- Cumberland County, Pennsylvania
- Technology
- Solar: 20.0 MW Β· Battery
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- June 2024
- Withdrawn
- November 2021
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Cumberland County
- Gobbler KnobSolar Β· 20.0 MW Β· agreement signed
- Solar project AG2-166, Cumberland CountySolar Β· 10.0 MW Β· in study
- Cumberland County LFOther Β· 6.4 MW Β· built
- Cumberland County LandfillOther Β· 4.8 MW Β· built
- Mountain Station Unit C2Gas Β· 1.0 MW Β· built
- Solar project W3-068, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AE2-252, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project W2-096, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project X2-004, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project X2-005, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project X4-010, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project Y2-061, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem