SOLAR Β· PJMSolar project X2-004, Cumberland County
Solar project X2-004, Cumberland County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Cumberland County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2011 (completed)
- Withdrawn / abandonedNov 2011 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X2-004
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Cumberland-W. Shore #1 69kV
- Location
- Cumberland County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 5 May 2011
- Proposed online date
- December 2012
- Withdrawn
- November 2011
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Cumberland County
- Gobbler KnobSolar Β· 20.0 MW Β· agreement signed
- Solar project AG2-166, Cumberland CountySolar Β· 10.0 MW Β· in study
- Cumberland County LFOther Β· 6.4 MW Β· built
- Cumberland County LandfillOther Β· 4.8 MW Β· built
- Mountain Station Unit C2Gas Β· 1.0 MW Β· built
- Solar project W3-068, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AE2-252, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project W2-096, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project X2-005, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project X4-010, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project Y2-061, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project W3-069, Cumberland CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem