United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMSolar project AG2-166, Cumberland County
Solar project AG2-166, Cumberland County is a 10.0 MW solar request in interconnection study in the PJM interconnection queue, in Cumberland County, Pennsylvania, connecting to PPL.
- PlanningQueued Jan 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-166
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Developer
- Costen Solar, Inc
- Connection point (POI)
- Newville-Nottingham Tap 1 69 kV
- Location
- Cumberland County, Pennsylvania
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 31 January 2025
- Proposed online date
- August 2023
Location
Marker shows the centre of Cumberland County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Cumberland County
- Gobbler KnobSolar · 20.0 MW · agreement signed
- Cumberland County LFOther · 6.4 MW · built
- Cumberland County LandfillOther · 4.8 MW · built
- Mountain Station Unit C2Gas · 1.0 MW · built
- Solar project W3-068, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project AE2-252, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project W2-096, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project X2-004, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project X2-005, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project X4-010, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project Y2-061, Cumberland CountySolar · 20.0 MW · withdrawn
- Solar project W3-069, Cumberland CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem