United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
GAS Β· WESTGas project GI-1304, Mckenzie County
Gas project GI-1304, Mckenzie County is a 100 MW gas request withdrawn in the West interconnection queue, in Mckenzie County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2013 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1304
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Williston-Ch. Creek 230kV
- Location
- Mckenzie County, North Dakota
- Technology
- Gas: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 4 April 2013
- Proposed online date
- November 2016
Location
Marker shows the centre of Mckenzie County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mckenzie County
- Solar project GEN-2020-091, Mckenzie CountySolar Β· 150 MW Β· agreement signed
- Gas project GI-1206, Mckenzie CountyGas Β· 125 MW Β· built
- Gas project GI-1204, Mckenzie CountyGas Β· 50.0 MW Β· built
- Gas project GI-1202, Mckenzie CountyGas Β· 50.0 MW Β· built
- Gas project GI-1208, Mckenzie CountyGas Β· 50.0 MW Β· built
- Gas project GEN-2020-014, Mckenzie CountyGas Β· 45.0 MW Β· built
- Solar project GEN-2021-008, Mckenzie CountySolar Β· 200 MW Β· withdrawn
- Battery storage project GEN-2024-185, Mckenzie CountyBattery storage Β· 199 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem