BATTERY STORAGE Β· SPPBattery storage project GEN-2024-185, Mckenzie County
Battery storage project GEN-2024-185, Mckenzie County is a 199 MW battery storage request withdrawn in the SPP interconnection queue, in Mckenzie County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-185
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- UMPC-MEC-Hay Butte 115 kV Substation
- Location
- Mckenzie County, North Dakota
- Technology
- Battery: 199 MW
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- January 2029
Location
Marker shows the centre of Mckenzie County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Mckenzie County
- Solar project GEN-2020-091, Mckenzie CountySolar Β· 150 MW Β· agreement signed
- Gas project GI-1206, Mckenzie CountyGas Β· 125 MW Β· built
- Gas project GI-1204, Mckenzie CountyGas Β· 50.0 MW Β· built
- Gas project GI-1202, Mckenzie CountyGas Β· 50.0 MW Β· built
- Gas project GI-1208, Mckenzie CountyGas Β· 50.0 MW Β· built
- Gas project GEN-2020-014, Mckenzie CountyGas Β· 45.0 MW Β· built
- Solar project GEN-2021-008, Mckenzie CountySolar Β· 200 MW Β· withdrawn
- Gas project GI-1304, Mckenzie CountyGas Β· 100 MW Β· withdrawn