United States › Grid › Interconnection queues › North Dakota
GAS · WESTGas project GI-1202, Mckenzie County
Gas project GI-1202, Mckenzie County is a 50.0 MW gas request built and operating in the West interconnection queue, in Mckenzie County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-1202
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Developer
- Basin Electric
- Connection point (POI)
- Watford City 115/230kV
- Location
- Mckenzie County, North Dakota
- Technology
- Gas: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 23 January 2012
- Proposed online date
- May 2013
Location
Marker shows the centre of Mckenzie County; the queue data does not give exact sites.
Power plants in North Dakota · Transmission lines in North Dakota
Other requests in Mckenzie County
- Solar project GEN-2020-091, Mckenzie CountySolar · 150 MW · agreement signed
- Gas project GI-1206, Mckenzie CountyGas · 125 MW · built
- Gas project GI-1204, Mckenzie CountyGas · 50.0 MW · built
- Gas project GI-1208, Mckenzie CountyGas · 50.0 MW · built
- Gas project GEN-2020-014, Mckenzie CountyGas · 45.0 MW · built
- Solar project GEN-2021-008, Mckenzie CountySolar · 200 MW · withdrawn
- Battery storage project GEN-2024-185, Mckenzie CountyBattery storage · 199 MW · withdrawn
- Gas project GI-1304, Mckenzie CountyGas · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem