United States › Grid › Interconnection queues › New York
ONSHORE WIND · NYISOWindy Hill Solar
Windy Hill Solar is a 20.0 MW onshore wind request withdrawn in the NYISO interconnection queue, in Washington County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2015 (completed)
- Withdrawn / abandonedJul 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 475
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- OneEnergy Development, LLC
- Connection point (POI)
- Battenkill Substation 115kV
- Location
- Washington County, New York
- Technology
- Wind: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 2 February 2015
- Withdrawn
- July 2015
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Fort Edward Solar Farm (NY53)Solar · 100 MW · in study
- Somers Solar, LLCSolar · 20.0 MW · in study
- NY13 SolarSolar · 20.0 MW · in study
- Dolan SolarSolar · 20.0 MW · in study
- Branscomb SolarSolar · 20.0 MW · built
- Darby SolarSolar · 20.0 MW · built
- Darby SolarSolar · 20.0 MW · built
- Branscomb SolarSolar · 20.0 MW · built
- Fort Edward Solar Farm (NY53)Solar · 100 MW · withdrawn
- Blue Star SolarSolar · 100 MW · withdrawn
- Champlain SolarSolar · 100 MW · withdrawn
- Fort Edward Solar Farm (NY53)Solar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem