United States › Grid › Interconnection queues › Pennsylvania
ONSHORE WIND · PJMPenn Wind
Penn Wind is a 18.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Northumberland County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2007 (completed)
- Withdrawn / abandonedJan 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S42
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Eldred-Fairview
- Location
- Northumberland County, Pennsylvania
- Technology
- Wind: 18.0 MW
- Total requested
- 18.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 15 May 2007
- Proposed online date
- May 2013
- Withdrawn
- January 2014
Location
Marker shows the centre of Northumberland County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Northumberland County
- Shamrock Energy CenterSolar · 20.0 MW · agreement signed
- Boyles Run SolarSolar · 15.9 MW · agreement signed
- Boyles Run SolarSolar · 15.9 MW · agreement signed
- Norwegian SolarSolar · 19.8 MW · suspended
- Northumberland SolarSolar · 65.0 MW · built
- Cottontail Solar 4 aka East Chilli SolarSolar · 20.0 MW · built
- Pine Hurst AcresOther · 0.0 MW · built
- Coal project R26, Northumberland CountyCoal · 940 MW · withdrawn
- Solar project AG2-430, Northumberland CountySolar · 60.0 MW · withdrawn
- Solar project AE1-127, Northumberland CountySolar · 50.0 MW · withdrawn
- Battery storage project AG1-050, Northumberland CountyBattery storage · 20.0 MW · withdrawn
- Solar project AH1-407, Northumberland CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem