United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AE1-127, Northumberland County
Solar project AE1-127, Northumberland County is a 50.0 MW solar request withdrawn in the PJM interconnection queue, in Northumberland County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedOct 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-127
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Eldred-Sunbury 69 kV
- Location
- Northumberland County, Pennsylvania
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 September 2018
- Proposed online date
- June 2021
- Withdrawn
- October 2019
Location
Marker shows the centre of Northumberland County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Northumberland County
- Shamrock Energy CenterSolar Β· 20.0 MW Β· agreement signed
- Boyles Run SolarSolar Β· 15.9 MW Β· agreement signed
- Boyles Run SolarSolar Β· 15.9 MW Β· agreement signed
- Norwegian SolarSolar Β· 19.8 MW Β· suspended
- Northumberland SolarSolar Β· 65.0 MW Β· built
- Cottontail Solar 4 aka East Chilli SolarSolar Β· 20.0 MW Β· built
- Pine Hurst AcresOther Β· 0.0 MW Β· built
- Coal project R26, Northumberland CountyCoal Β· 940 MW Β· withdrawn
- Solar project AG2-430, Northumberland CountySolar Β· 60.0 MW Β· withdrawn
- Battery storage project AG1-050, Northumberland CountyBattery storage Β· 20.0 MW Β· withdrawn
- Solar project AH1-407, Northumberland CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AH1-406, Northumberland CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem