United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

ONSHORE WIND Β· MISO

Onshore wind project G578, Adair County

Onshore wind project G578, Adair County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Adair County, Missouri.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2005 (completed)
  2. Withdrawn / abandonedSep 2008 (project stopped here)
  3. ConsentedSep 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G578
Grid region
MISO (Midcontinent)
Connection point (POI)
Adair 161kV Substation
Location
Adair County, Missouri
Technology
Wind: 300 MW
Total requested
300 MW
Study phase
Network Upgrade
Queue status
Withdrawn
Entered queue
20 December 2005
Agreement signed
30 September 2008
Proposed online date
October 2006
Withdrawn
September 2008

Location

Marker shows the centre of Adair County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Adair County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem