United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2005-017, Sherman County
Onshore wind project GEN-2005-017, Sherman County is a 340 MW onshore wind request withdrawn in the SPP interconnection queue, in Sherman County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2005 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2005-017
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Location
- Sherman County, Texas
- Technology
- Wind: 340 MW
- Total requested
- 340 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 26 September 2005
- Proposed online date
- December 2007
Location
Marker shows the centre of Sherman County; the queue data does not give exact sites.
Other requests in Sherman County
- Onshore wind project GEN-2009-072, Sherman CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Onshore wind project GEN-2023-010, Sherman CountyOnshore wind Β· 280 MW Β· withdrawn
- Onshore wind project GEN-2013-001, Sherman CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2007-024, Sherman CountyOnshore wind Β· 120 MW Β· withdrawn
- Onshore wind project GEN-2011-012, Sherman CountyOnshore wind Β· 105 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem