United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2005-017, Sherman County

Onshore wind project GEN-2005-017, Sherman County is a 340 MW onshore wind request withdrawn in the SPP interconnection queue, in Sherman County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2005-017
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Location
Sherman County, Texas
Technology
Wind: 340 MW
Total requested
340 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
26 September 2005
Proposed online date
December 2007

Location

Marker shows the centre of Sherman County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Sherman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem