United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2013-001, Sherman County

Onshore wind project GEN-2013-001, Sherman County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Sherman County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2012 (completed)
  2. Withdrawn / abandonedOct 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2013-001
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Hitchland - Moore County (North Plains) 230 kv
Location
Sherman County, Texas
Technology
Wind: 200 MW
Total requested
200 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 December 2012
Proposed online date
January 2014
Withdrawn
October 2013

Location

Marker shows the centre of Sherman County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Sherman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem