United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2013-001, Sherman County
Onshore wind project GEN-2013-001, Sherman County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Sherman County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2012 (completed)
- Withdrawn / abandonedOct 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2013-001
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Hitchland - Moore County (North Plains) 230 kv
- Location
- Sherman County, Texas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 31 December 2012
- Proposed online date
- January 2014
- Withdrawn
- October 2013
Location
Marker shows the centre of Sherman County; the queue data does not give exact sites.
Other requests in Sherman County
- Onshore wind project GEN-2009-072, Sherman CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Onshore wind project GEN-2005-017, Sherman CountyOnshore wind Β· 340 MW Β· withdrawn
- Onshore wind project GEN-2023-010, Sherman CountyOnshore wind Β· 280 MW Β· withdrawn
- Onshore wind project GEN-2007-024, Sherman CountyOnshore wind Β· 120 MW Β· withdrawn
- Onshore wind project GEN-2011-012, Sherman CountyOnshore wind Β· 105 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem