ONSHORE WIND Β· MISO

Onshore wind project J501, Hancock County

Onshore wind project J501, Hancock County is a 500 MW onshore wind request withdrawn in the MISO interconnection queue, in Hancock County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedSep 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J501
Grid region
MISO (Midcontinent)
Connection point (POI)
MEC 345 kV Kossuth County substation
Location
Hancock County, Iowa
Technology
Wind: 500 MW
Total requested
500 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
13 November 2015
Proposed online date
September 2017
Withdrawn
September 2017

Location

Marker shows the centre of Hancock County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Hancock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem