United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· MISO

Onshore wind project J049, Hancock County

Onshore wind project J049, Hancock County is a 16.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Hancock County, Iowa.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2009 (completed)
  2. Withdrawn / abandonedOct 2009 (project stopped here)
  3. ConsentedOct 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J049
Grid region
MISO (Midcontinent)
Connection point (POI)
Lime Creek Substation
Location
Hancock County, Iowa
Technology
Wind: 16.0 MW
Total requested
16.0 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
19 June 2009
Agreement signed
28 October 2009
Proposed online date
July 2011
Withdrawn
October 2009

Location

Marker shows the centre of Hancock County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Hancock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem