United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J1727, Hancock County
Onshore wind project J1727, Hancock County is a 33.8 MW onshore wind request withdrawn in the MISO interconnection queue, in Hancock County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedOct 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1727
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Lime Creek 161kV
- Location
- Hancock County, Iowa
- Technology
- Wind: 33.8 MW
- Total requested
- 33.8 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 24 June 2020
- Proposed online date
- December 2023
- Withdrawn
- October 2020
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
- Onshore wind project G735, Hancock CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G595, Hancock CountyOnshore wind Β· 150 MW Β· built
- Onshore wind project G056, Hancock CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project J091, Hancock CountyOnshore wind Β· 66.0 MW Β· built
- Onshore wind project J116, Hancock CountyOnshore wind Β· 999 MW Β· withdrawn
- Onshore wind project J501, Hancock CountyOnshore wind Β· 500 MW Β· withdrawn
- Gas project J130, Hancock CountyGas Β· 300 MW Β· withdrawn
- Onshore wind project R68, Hancock CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project J2079, Hancock CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J1729, Hancock CountyOnshore wind Β· 43.0 MW Β· withdrawn
- Onshore wind project J1767, Hancock CountyOnshore wind Β· 37.0 MW Β· withdrawn
- Onshore wind project J049, Hancock CountyOnshore wind Β· 16.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem