BATTERY STORAGE · SPP

Battery storage project GEN-2023-SR7, Wayne County

Battery storage project GEN-2023-SR7, Wayne County is a 135 MW battery storage request in interconnection study in the SPP interconnection queue, in Wayne County, Nebraska, connecting to NPPD.

Queue statusIn planning
  1. PlanningQueued Dec 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingDec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GEN-2023-SR7
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Hoskins 345 kV Substation
Location
Wayne County, Nebraska
Technology
Battery: 135 MW
Total requested
135 MW
Service type
Energy only (ERIS)
Study phase
FACILITY STUDY STAGE
Queue status
Active
Entered queue
16 December 2022
Proposed online date
December 2024
Came online
December 2024

Location

Marker shows the centre of Wayne County; the queue data does not give exact sites.

Power plants in Nebraska · Transmission lines in Nebraska

Other requests in Wayne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem