BATTERY STORAGE · SPPBattery storage project GEN-2023-SR7, Wayne County
Battery storage project GEN-2023-SR7, Wayne County is a 135 MW battery storage request in interconnection study in the SPP interconnection queue, in Wayne County, Nebraska, connecting to NPPD.
Queue statusIn planning
- PlanningQueued Dec 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingDec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2023-SR7
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Hoskins 345 kV Substation
- Location
- Wayne County, Nebraska
- Technology
- Battery: 135 MW
- Total requested
- 135 MW
- Service type
- Energy only (ERIS)
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 16 December 2022
- Proposed online date
- December 2024
- Came online
- December 2024
Location
Marker shows the centre of Wayne County; the queue data does not give exact sites.
Other requests in Wayne County
- Onshore wind project GEN-2017-201, Wayne CountyOnshore wind · 250 MW · agreement signed
- Onshore wind project GEN-2016-043, Wayne CountyOnshore wind · 230 MW · built
- Onshore wind project GEN-2015-007, Wayne CountyOnshore wind · 160 MW · built
- Onshore wind project GEN-2011-027, Wayne CountyOnshore wind · 120 MW · built
- Onshore wind project GEN-2014-055, Wayne CountyOnshore wind · 160 MW · withdrawn
- Onshore wind project GEN-2013-039, Wayne CountyOnshore wind · 160 MW · withdrawn
- Solar project GEN-2023-SR6, Wayne CountySolar · 100 MW · withdrawn
- Onshore wind project GEN-2006-038N011, Wayne CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project GEN-2010-026, Wayne CountyOnshore wind · 99.0 MW · withdrawn
- Battery storage project GEN-2022-044, Wayne CountyBattery storage · 80.0 MW · withdrawn
- Onshore wind project GEN-2018-012, Wayne CountyOnshore wind · 74.1 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem