πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

ONSHORE WIND Β· SPP

Onshore wind project GEN-2018-012, Wayne County

Onshore wind project GEN-2018-012, Wayne County is a 74.1 MW onshore wind request withdrawn in the SPP interconnection queue, in Wayne County, Nebraska, connecting to NPPD.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedFeb 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingNov 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-012
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Antelope 345kV Substation
Location
Wayne County, Nebraska
Technology
Wind: 74.1 MW
Total requested
74.1 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 April 2018
Proposed online date
November 2025
Came online
November 2025
Withdrawn
February 2024

Location

Marker shows the centre of Wayne County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Wayne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem