πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Nebraska

ONSHORE WIND Β· SPP

Onshore wind project GEN-2010-026, Wayne County

Onshore wind project GEN-2010-026, Wayne County is a 99.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Wayne County, Nebraska, connecting to NPPD.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2010-026
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
NPPD
Connection point (POI)
Hoskins 230kV
Location
Wayne County, Nebraska
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 March 2010
Proposed online date
October 2012

Location

Marker shows the centre of Wayne County; the queue data does not give exact sites.

Power plants in Nebraska Β· Transmission lines in Nebraska

Other requests in Wayne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem