United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

BATTERY STORAGE Β· WEST

Battery storage project Company KC, Story County

Battery storage project Company KC, Story County is a 300 MW battery storage request withdrawn in the West interconnection queue, in Story County, Nevada, connecting to NV Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Company KC
Grid region
West (non-ISO utilities)
Utility / transmission owner
NV Energy
Location
Story County, Nevada
Technology
Battery: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
27 September 2019
Proposed online date
November 2022

Location

Marker shows the centre of Story County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Story County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem