United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project J2067, Clay County
Onshore wind project J2067, Clay County is a 39.4 MW onshore wind request withdrawn in the MISO interconnection queue, in Clay County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedOct 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2067
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Tamarac
- Location
- Clay County, Minnesota
- Technology
- Wind: 39.4 MW
- Total requested
- 39.4 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3
- Queue status
- Withdrawn
- Entered queue
- 14 September 2021
- Proposed online date
- September 2024
- Withdrawn
- October 2021
Location
Marker shows the centre of Clay County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Clay County
- Solar project J3762, Clay CountySolar Β· 430 MW Β· in study
- Solar project J4147, Clay CountySolar Β· 245 MW Β· in study
- Solar project J4148, Clay CountySolar Β· 245 MW Β· in study
- Onshore wind project G006, Clay CountyOnshore wind Β· 2.0 MW Β· in study
- Other project GI-0825, Clay CountyOther Β· 11.0 MW Β· built
- Onshore wind project G859, Clay CountyOnshore wind Β· 600 MW Β· withdrawn
- Onshore wind project G821, Clay CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J001, Clay CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project H099, Clay CountyOnshore wind Β· 150 MW Β· withdrawn
- Gas project GI-0109, Clay CountyGas Β· 50.0 MW Β· withdrawn
- Onshore wind project G414, Clay CountyOnshore wind Β· 10.0 MW Β· withdrawn
- Onshore wind project G846, Clay CountyOnshore wind Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem