BATTERY STORAGE Β· MISO

Battery storage project J2360, Vigo County

Battery storage project J2360, Vigo County is a 90.0 MW battery storage request withdrawn in the MISO interconnection queue, in Vigo County, Indiana, connecting to DUKE ENERGY INDIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2360
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
TH Pfizer Jct. - Worthington (HED)
Location
Vigo County, Indiana
Technology
Battery: 90.0 MW
Total requested
90.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
13 September 2022
Proposed online date
May 2027
Withdrawn
October 2025

Location

Marker shows the centre of Vigo County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Vigo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem