United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 378A, Santa Rosa County
Solar project 378A, Santa Rosa County is a 74.5 MW solar request built and operating in the Southeast interconnection queue, in Santa Rosa County, Florida, connecting to Florida Power & Light.
Request details
- Queue ID
- 378A
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Alligator Swamp - Shoal River 230 Kv
- Location
- Santa Rosa County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 19 December 2019
- Came online
- January 2023
Location
Marker shows the centre of Santa Rosa County; the queue data does not give exact sites.
Other requests in Santa Rosa County
- Solar project 336A, Santa Rosa CountySolar · 74.9 MW · built
- Solar project IC-680, Santa Rosa CountySolar · 74.9 MW · withdrawn
- Solar project IC-687, Santa Rosa CountySolar · 50.0 MW · withdrawn
- Solar project IC-686, Santa Rosa CountySolar · 50.0 MW · withdrawn
- Solar project IC-399, Santa Rosa CountySolar · 40.0 MW · withdrawn
- Solar project IC-667, Santa Rosa CountySolar · 40.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem