United States › Grid › Interconnection queues › Washington

ONSHORE WIND · WEST

NextEra Energy Resources

NextEra Energy Resources is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Garfield County, Washington, connecting to NextEra Energy Resources, LLC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2002 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G101
Grid region
West (non-ISO utilities)
Utility / transmission owner
NextEra Energy Resources, LLC
Developer
NextEra Energy Resources, LLC
Connection point (POI)
500 kV McNary-Lower Monumental line
Location
Garfield County, Washington
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Energy only (ERIS)
Queue status
Withdrawn
Entered queue
4 June 2002
Proposed online date
September 2003

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem