United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project G0824, Garfield County

Solar + storage project G0824, Garfield County is a 455 MW solar + storage request withdrawn in the West interconnection queue, in Garfield County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0824
Grid region
West (non-ISO utilities)
Connection point (POI)
Central Ferry Substation at 500 kV
Location
Garfield County, Washington
Technology
Solar: 303 MW Β· Battery: 152 MW
Total requested
455 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
18 November 2022
Proposed online date
December 2024

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem