United States › Grid › Interconnection queues › Washington

ONSHORE WIND · WEST

Lower Snake Phase 1

Lower Snake Phase 1 is a 150 MW onshore wind request built and operating in the West interconnection queue, in Garfield County, Washington, connecting to Puget Sound Energy, Inc..

Queue statusOperating
  1. PlanningQueued Aug 2007 (completed)
  2. ConsentedMay 2010 (completed)
  3. Construction (completed)
  4. OperatingTarget Dec 2011 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
G0285
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy, Inc.
Connection point (POI)
Central Ferry Substation
Location
Garfield County, Washington
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Study phase
IA Executed
Queue status
Operational
Entered queue
13 August 2007
Agreement signed
13 May 2010
Proposed online date
December 2011

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington · Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem