United States βΊ Grid βΊ Interconnection queues βΊ Washington
SOLAR Β· WESTSolar project G0624, Garfield County
Solar project G0624, Garfield County is a 1,250 MW solar request withdrawn in the West interconnection queue, in Garfield County, Washington.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0624
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- Central Ferry Substation
- Location
- Garfield County, Washington
- Technology
- Solar: 1,250 MW
- Total requested
- 1,250 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 31 May 2019
- Proposed online date
- October 2023
Location
Marker shows the centre of Garfield County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Garfield County
- Wind + storage project TCS-14, Garfield CountyWind + storage Β· 375 MW Β· under construction
- Other project 110, Garfield CountyOther Β· 560 MW Β· in study
- Onshore wind project G0872, Garfield CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project CS25-11, Garfield CountyOnshore wind Β· 300 MW Β· in study
- Lower Snake Phase 1Onshore wind Β· 150 MW Β· built
- Other project G0665, Garfield CountyOther Β· 1,125 MW Β· withdrawn
- Other project G0730, Garfield CountyOther Β· 1,125 MW Β· withdrawn
- Solar + storage project G0824, Garfield CountySolar + storage Β· 455 MW Β· withdrawn
- Onshore wind project G0727, Garfield CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project CS23-02, Garfield CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G0324, Garfield CountyOnshore wind Β· 300 MW Β· withdrawn
- Solar + storage project 133, Garfield CountySolar + storage Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem