SOLAR · PJMBE-PINE 1 Cain Road
BE-PINE 1 Cain Road is a 17.1 MW solar request built and operating in the PJM interconnection queue, in Beaver County, Pennsylvania, connecting to DL.
Request details
- Queue ID
- AE2-114
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DL
- Connection point (POI)
- Midland 23 kV I
- Location
- Beaver County, Pennsylvania
- Technology
- Solar: 17.1 MW
- Total requested
- 17.1 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Operational
- Entered queue
- 1 March 2019
- Proposed online date
- December 2023
- Came online
- November 2023
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Beaver County
- Battery storage project AG2-621, Beaver CountyBattery storage · 150 MW · in study
- Solar + storage project AH2-253, Beaver CountySolar + storage · 70.0 MW · in study
- Solar project AH2-063, Beaver CountySolar · 20.0 MW · in study
- Solar project AH2-064, Beaver CountySolar · 10.0 MW · in study
- Nuclear project N13, Beaver CountyNuclear · 1,630 MW · built
- Pennsylvania Chemicals Generating FacilityGas · 205 MW · built
- Beaver Valley 1Nuclear · 81.0 MW · built
- Beaver Valley 2Nuclear · 77.0 MW · built
- Coal project G541, Beaver CountyCoal · 50.0 MW · built
- Coal project G543, Beaver CountyCoal · 50.0 MW · built
- Beaver Valley Power StationNuclear · 48.0 MW · built
- Beaver Valley Power StationNuclear · 43.0 MW · built