SOLAR · PJMSolar project AH2-064, Beaver County
Solar project AH2-064, Beaver County is a 10.0 MW solar request in interconnection study in the PJM interconnection queue, in Beaver County, Pennsylvania, connecting to DL.
- PlanningQueued Dec 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-064
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DL
- Connection point (POI)
- South Ramsey 23 kV
- Location
- Beaver County, Pennsylvania
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 31 December 2021
- Proposed online date
- December 2023
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Beaver County
- Battery storage project AG2-621, Beaver CountyBattery storage · 150 MW · in study
- Solar + storage project AH2-253, Beaver CountySolar + storage · 70.0 MW · in study
- Solar project AH2-063, Beaver CountySolar · 20.0 MW · in study
- Nuclear project N13, Beaver CountyNuclear · 1,630 MW · built
- Pennsylvania Chemicals Generating FacilityGas · 205 MW · built
- Beaver Valley 1Nuclear · 81.0 MW · built
- Beaver Valley 2Nuclear · 77.0 MW · built
- Coal project G541, Beaver CountyCoal · 50.0 MW · built
- Coal project G543, Beaver CountyCoal · 50.0 MW · built
- Beaver Valley Power StationNuclear · 48.0 MW · built
- Beaver Valley Power StationNuclear · 43.0 MW · built
- BE-PINE 2 Dam RoadSolar · 17.1 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem