United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Swift Air Solar

Swift Air Solar is a 147 MW solar request built and operating in the ERCOT interconnection queue, in Ector County, Texas.

Queue statusOperating
  1. PlanningQueued Nov 2022 (completed)
  2. ConsentedApr 2024 (completed)
  3. Construction (completed)
  4. OperatingJan 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
24INR0421
Grid region
ERCOT (Texas)
Developer
Swift Air Solar, LLC
Connection point (POI)
Tap 138kV 1019 Moss Switch β€šΓ„Γ¬ 11128 Shin Oak POD
Location
Ector County, Texas
Technology
Solar: 147 MW
Total requested
147 MW
Study phase
IA
Queue status
Operational
Entered queue
6 November 2022
Agreement signed
30 April 2024
Proposed online date
August 2025
Came online
January 2025

Location

Marker shows the centre of Ector County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ector County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem