United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTSwift Air Solar
Swift Air Solar is a 147 MW solar request built and operating in the ERCOT interconnection queue, in Ector County, Texas.
Request details
- Queue ID
- 24INR0421
- Grid region
- ERCOT (Texas)
- Developer
- Swift Air Solar, LLC
- Connection point (POI)
- Tap 138kV 1019 Moss Switch βΓΓ¬ 11128 Shin Oak POD
- Location
- Ector County, Texas
- Technology
- Solar: 147 MW
- Total requested
- 147 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 6 November 2022
- Agreement signed
- 30 April 2024
- Proposed online date
- August 2025
- Came online
- January 2025
Location
Marker shows the centre of Ector County; the queue data does not give exact sites.
Other requests in Ector County
- Greyhound SolarSolar Β· 336 MW Β· agreement signed
- Sisters SolarSolar + storage Β· 302 MW Β· agreement signed
- Greyhound Solar - Phase ESolar Β· 151 MW Β· agreement signed
- Greyhound Solar - Phase FSolar Β· 102 MW Β· agreement signed
- Apple BESSBattery storage Β· 9.9 MW Β· agreement signed
- Gypsum Plains SolarSolar + storage Β· 503 MW Β· in study
- Velociraptor BESS IISolar + storage Β· 261 MW Β· in study
- Velociraptor BESS ISolar + storage Β· 261 MW Β· in study
- Van Zandt Energy StorageBattery storage Β· 257 MW Β· in study
- Velociraptor Solar IISolar + storage Β· 252 MW Β· in study
- Velociraptor Solar ISolar + storage Β· 252 MW Β· in study
- Gypsum Plains StorageSolar + storage Β· 211 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem