Gas project 352, Sweet Grass County

Gas project 352, Sweet Grass County is a 150 MW gas request withdrawn in the West interconnection queue, in Sweet Grass County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
352
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
230kV between Stillwater Wind and Wilsall
Location
Sweet Grass County, Montana
Technology
Gas: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
19 July 2018
Proposed online date
July 2019

Location

Marker shows the centre of Sweet Grass County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Sweet Grass County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem