ONSHORE WIND Β· WEST

Onshore wind project 284, Sweet Grass County

Onshore wind project 284, Sweet Grass County is a 80.0 MW onshore wind request withdrawn in the West interconnection queue, in Sweet Grass County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
284
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Lower Duck Creek 161kV Substation Springdale, MT
Location
Sweet Grass County, Montana
Technology
Wind: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
1 June 2016
Proposed online date
November 2018

Location

Marker shows the centre of Sweet Grass County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Sweet Grass County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem