United States βΊ Grid βΊ Interconnection queues βΊ Montana
ONSHORE WIND Β· WESTOnshore wind project 146, Sweet Grass County
Onshore wind project 146, Sweet Grass County is a 20.0 MW onshore wind request withdrawn in the West interconnection queue, in Sweet Grass County, Montana, connecting to NorthWestern Energy.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2011 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 146
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- NorthWestern Energy
- Connection point (POI)
- 8 miles west of Big Timber
- Location
- Sweet Grass County, Montana
- Technology
- Wind: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study, Facilities Study
- Queue status
- Withdrawn
- Entered queue
- 22 July 2011
- Proposed online date
- December 2013
Location
Marker shows the centre of Sweet Grass County; the queue data does not give exact sites.
Other requests in Sweet Grass County
- Onshore wind project 172, Sweet Grass CountyOnshore wind Β· 25.0 MW Β· built
- Onshore wind project 79, Sweet Grass CountyOnshore wind Β· 200 MW Β· withdrawn
- Gas project 352, Sweet Grass CountyGas Β· 150 MW Β· withdrawn
- Gas project 338, Sweet Grass CountyGas Β· 128 MW Β· withdrawn
- Onshore wind project 128, Sweet Grass CountyOnshore wind Β· 125 MW Β· withdrawn
- Onshore wind project 54, Sweet Grass CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project 52, Sweet Grass CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 80, Sweet Grass CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 112, Sweet Grass CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 284, Sweet Grass CountyOnshore wind Β· 80.0 MW Β· withdrawn
- Onshore wind project 209, Sweet Grass CountyOnshore wind Β· 25.0 MW Β· withdrawn
- Onshore wind project 157, Sweet Grass CountyOnshore wind Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem