United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

ONSHORE WIND Β· WEST

Onshore wind project 157, Sweet Grass County

Onshore wind project 157, Sweet Grass County is a 20.0 MW onshore wind request withdrawn in the West interconnection queue, in Sweet Grass County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2012 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
157
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
NWE's 50kV line between Livingston and Big Timber
Location
Sweet Grass County, Montana
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
System Impact Study Facilities Study
Queue status
Withdrawn
Entered queue
12 September 2012
Proposed online date
December 2012

Location

Marker shows the centre of Sweet Grass County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Sweet Grass County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem