United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
ONSHORE WIND Β· MISOOnshore wind project J221, St. Croix County
Onshore wind project J221, St. Croix County is a 5.0 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Croix County, Wisconsin.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2011 (completed)
- Withdrawn / abandonedJan 2014 (project stopped here)
- ConsentedJan 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J221
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Pine Lake - Apple River 161 kV
- Location
- St. Croix County, Wisconsin
- Technology
- Wind: 5.0 MW
- Total requested
- 5.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 22 August 2011
- Agreement signed
- 30 January 2014
- Proposed online date
- January 2014
- Withdrawn
- January 2014
Location
Marker shows the centre of St. Croix County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in St. Croix County
- Solar project J926, St. Croix CountySolar Β· 101 MW Β· under construction
- Solar project J1092, St. Croix CountySolar Β· 100 MW Β· agreement signed
- Solar project J1657, St. Croix CountySolar Β· 100 MW Β· in study
- Solar project J1582, St. Croix CountySolar Β· 160 MW Β· withdrawn
- Solar project J3476, St. Croix CountySolar Β· 150 MW Β· withdrawn
- Battery storage project J2621, St. Croix CountyBattery storage Β· 115 MW Β· withdrawn
- Solar project J2070, St. Croix CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project J177, St. Croix CountyOnshore wind Β· 97.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem