United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

ONSHORE WIND Β· MISO

Onshore wind project J221, St. Croix County

Onshore wind project J221, St. Croix County is a 5.0 MW onshore wind request withdrawn in the MISO interconnection queue, in St. Croix County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2011 (completed)
  2. Withdrawn / abandonedJan 2014 (project stopped here)
  3. ConsentedJan 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J221
Grid region
MISO (Midcontinent)
Connection point (POI)
Pine Lake - Apple River 161 kV
Location
St. Croix County, Wisconsin
Technology
Wind: 5.0 MW
Total requested
5.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
22 August 2011
Agreement signed
30 January 2014
Proposed online date
January 2014
Withdrawn
January 2014

Location

Marker shows the centre of St. Croix County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Other requests in St. Croix County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem