United States βΊ Grid βΊ Interconnection queues βΊ Wisconsin
SOLAR Β· MISOSolar project J3476, St. Croix County
Solar project J3476, St. Croix County is a 150 MW solar request withdrawn in the MISO interconnection queue, in St. Croix County, Wisconsin, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3476
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Pine Lake Tap - APPLE RIVER (DPC) 161.0kV
- Location
- St. Croix County, Wisconsin
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 17 April 2024
- Proposed online date
- September 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of St. Croix County; the queue data does not give exact sites.
Power plants in Wisconsin Β· Transmission lines in Wisconsin
Other requests in St. Croix County
- Solar project J926, St. Croix CountySolar Β· 101 MW Β· under construction
- Solar project J1092, St. Croix CountySolar Β· 100 MW Β· agreement signed
- Solar project J1657, St. Croix CountySolar Β· 100 MW Β· in study
- Solar project J1582, St. Croix CountySolar Β· 160 MW Β· withdrawn
- Battery storage project J2621, St. Croix CountyBattery storage Β· 115 MW Β· withdrawn
- Solar project J2070, St. Croix CountySolar Β· 100 MW Β· withdrawn
- Onshore wind project J177, St. Croix CountyOnshore wind Β· 97.5 MW Β· withdrawn
- Onshore wind project J221, St. Croix CountyOnshore wind Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem