Solar project GEN-2016-039, Randall County

Solar project GEN-2016-039, Randall County is a 112 MW solar request withdrawn in the SPP interconnection queue, in Randall County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedJun 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-039
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Swisher 115kV
Location
Randall County, Texas
Technology
Solar: 112 MW
Total requested
112 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 March 2016
Proposed online date
December 2017
Withdrawn
June 2021

Location

Marker shows the centre of Randall County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Randall County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem