United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2006-039, Randall County
Onshore wind project GEN-2006-039, Randall County is a 400 MW onshore wind request withdrawn in the SPP interconnection queue, in Randall County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2006 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2006-039
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Tap Potter - Plant X 230kV (South Randle County) 230kV
- Location
- Randall County, Texas
- Technology
- Wind: 400 MW
- Total requested
- 400 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 October 2006
- Proposed online date
- October 2008
Location
Marker shows the centre of Randall County; the queue data does not give exact sites.
Other requests in Randall County
- Solar + storage project GEN-2024-364, Randall CountySolar + storage Β· 300 MW Β· in study
- Solar project GEN-2024-153, Randall CountySolar Β· 250 MW Β· in study
- Tierra Blanca WOnshore wind Β· 200 MW Β· suspended
- Northdraw WindOnshore wind Β· 150 MW Β· suspended
- Onshore wind project GEN-2007-048, Randall CountyOnshore wind Β· 400 MW Β· withdrawn
- Gas project GEN-2013-031, Randall CountyGas Β· 370 MW Β· withdrawn
- Solar project GEN-2017-081, Randall CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project GEN-2023-086, Randall CountySolar + storage Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2006-047, Randall CountyOnshore wind Β· 240 MW Β· withdrawn
- Onshore wind project GEN-2006-045, Randall CountyOnshore wind Β· 240 MW Β· withdrawn
- Onshore wind project GEN-2008-120, Randall CountyOnshore wind Β· 239 MW Β· withdrawn
- Solar project GEN-2023-185, Randall CountySolar Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem