United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2006-039, Randall County

Onshore wind project GEN-2006-039, Randall County is a 400 MW onshore wind request withdrawn in the SPP interconnection queue, in Randall County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2006-039
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Tap Potter - Plant X 230kV (South Randle County) 230kV
Location
Randall County, Texas
Technology
Wind: 400 MW
Total requested
400 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 October 2006
Proposed online date
October 2008

Location

Marker shows the centre of Randall County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Randall County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem